Welcome to Savan!
Product Details
Related Products
Applications & Suitable Water Head:
- 1.Power: 500kw~500MW
- 2.Frequency: 50hz or 60hz
- 3.Output Type: AC three phase
- 4.Output voltage:400V, 3.3KV, 6.3KV, 10.5KV, or 13.8KV
- 5.Working Water head:
- For francis turbine 40~700M - 6.Warranty period: 1 year(or more)
- 7.Lifespan: 30~50 years
Company Information
We Chongqing Savan Electromechanical Equipment Co., Ltd ("CSEC" in short), like to introduce us as a firm engaged in Design, Engineering, Manufacture, Supply, Erection, Testing & Commissioning of Electro-mechanical components of Hydropower Projects catering to the projects with unit capacity ranging from 200 kW to 100,000 kW as per following details.
· Propellor or Kaplan turbines with a maximum runner diameter of 4500 MM.
· Francis turbines with a maximum turbine output of 100 000 kW.
· Pelton turbines with a maximum turbine output of 100 000 kW.
Installation Process
Product Packing
Csec International Exchange
FAQ
Q: How do you control the quality ?
A: We have QC team comply with TQM,each step is in compliance to the standards. At the same time ,we will take photos and shoot video for you .
Q: What about lead or shipping time?
A: The lead time depends on quantity you ordered ,but generally within 40-50 days upon receipt of advance payment.
Q: Why should I choose your company?
A: We take customers's requirments as our mission,and take each details very carefully. We have about 24 years experience for electric power business. We try to support our customers always,including delievery time,price , pre-sale, after-sales, though We are not the best,but we are always to improve ourself and meet your needs.Choose us ,will don't make you disappointed.
More Information, please feel free to contact Andy
3rd Floor Urban Diary No.101 Torch Road Jiulongpo District Chongqing, P.R. China
Tel: +86-23-68198297
andyzhou821 andyzhou821
Our Service
CSEC is not only a supplier of electromechanical equipment for hydro power plants, but also an advisor to hydro powered developers and is involved in the projects since very early stage. We also provide technical support and service to hydro power developers including site survey and plant design , Installation and commissioning of equipment, plant maintenance and overhaul while spare parts shall be provided to site quickly.
→Click here and you will find more products